Many clients appoint an architect up to planning, or to a Building Control submission, and then run the build themselves or leave it to the contractor. It saves on fees, and it’s a reasonable choice. I’ve worked this way on several projects, including a couple where I’ve been available for site queries but not making regular inspections.
Why drawings alone don’t hold the line
However much we try, drawings can’t show everything, and many details are the way they are for a multitude of reasons. We can’t always show the decisions made, the manufacturer’s guidance, or the conceptual, structural, or thermal logic driving them. We try to capture everything in as much detail and as clearly as possible, calling out important ‘hidden’ information such as alignments where needed, but fundamentally a drawing shows what goes where, not why it goes there.
Without someone who knows the reasoning seeing the work, either by visiting the site or reviewing it through photographs, decisions can be made without considering the wider project. “It’ll be fine” or, commonly heard, “We did it like this on another project.” Two projects are never quite the same, and what worked on one doesn’t always work on the next.
Contractors solve problems on site every day, and on existing buildings especially, the full picture only emerges once walls and floors are opened up. Decisions on site are inevitable. They go best when the person making them knows why the design is the way it is, or can easily ask someone who does.
Two examples from site
One project was stick-built timber frame (the traditional method, building up the frame piece by piece on site, rather than using prefabricated panels). The engineer sized the posts and beams, and the rafters, joists, and studs were set out at regular centres, typically 400mm.

The beam – The cathedral ceiling had plenty going on, with its vaulting, a rooflight, and a bay window. Around those, it was designed as one clean surface. For that to work, one of the supporting beams had to sit in line with the rafters rather than below them. The drawings showed it in exactly that position, but nothing on them explained the reasoning behind it.
On site, the beam was put in underneath the rafters. If left there, it would have dropped below the ceiling line, needing a large boxing out and creating awkward junctions. Leaving it exposed wasn’t an option either: it was basic structural timber never meant to be seen. When I saw the issue in photographs, I raised it with the client and the beam was moved.

Insulation – That same project also had issues with how the insulation was installed between the studs. It needs to be full depth, with no gaps, and nothing squashed for it to perform as intended. Here in some areas it was compressed, in others a thin piece didn’t fill the depth of the stud, with plenty of gaps throughout. I sent the client an example of how it should look when installed properly, and they confirmed it was corrected before boarding.
Once this was boarded up the client would never have seen it. They would have felt it for the life of the building, through cold spots, higher bills, and condensation risks.
Quality and safety
Every specification is a decision about how the finished building should perform: how warm it is, what it costs to run, how long it lasts. The client is paying for that level of performance. If it isn’t built that way they don’t get it, and often they never find out. The same goes for structure, fire stopping and moisture control. They all end up hidden behind linings, where problems stay out of sight until they’re expensive.
Who checks the work?
Since October 2023, changes to the Building Regulations have given clients, designers and contractors legal duties to plan, manage and monitor work so that it complies. On a domestic project the client’s duties pass to the contractor by default, so the contractor is often checking their own work.
Building control inspections are periodic and check compliance with the Regulations. A beam that works structurally but sits in the wrong place is outside their remit. Poorly fitted insulation is within it, but only if an inspector happens to visit before it’s boarded over.
Anyone who makes a design decision on site takes on a designer’s legal duties. And if your architect was the principal designer and their appointment ends at tender, the regulations require a replacement for the rest of the build.
What oversight can look like
The architect’s way isn’t necessarily the only way something can be built. The best architecture comes out of a conversation between the people who’ll live in a building, the people who design it and the people who build it. Everyone brings their own experience and expertise. But removing the designers from the conversation once building works start brings risk and needs to be carefully considered.
There are a few levels of involvement:
- Full service (RIBA Stage 5): regular site inspections, administering the building contract and certifying payments.
- Key-stage visits: inspections at the points where problems get covered up, such as when the frame is complete and before insulation is boarded over.
- On call: answering site queries and reviewing progress photos.
A photo at the right moment can be enough to catch an issue, but it relies on someone taking and sending it, and on being told a fix was made rather than seeing it. Key-stage visits mean someone who knows the design sees the work before it disappears and is more likely to spot a problem.
If you’re deciding how much architect involvement you need during your build, get in touch and we can talk through which level suits your project.